• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
WU Shi-qiang, WU Xiu-feng, ZHOU Hui, TONG Zhong-shan, YANG Feng, YU Song. Flood control operation numerical model for Linhuaigang project on Huai River[J]. Advances in Water Science, 2005, 16(2): 196-202.
Citation: WU Shi-qiang, WU Xiu-feng, ZHOU Hui, TONG Zhong-shan, YANG Feng, YU Song. Flood control operation numerical model for Linhuaigang project on Huai River[J]. Advances in Water Science, 2005, 16(2): 196-202.

Flood control operation numerical model for Linhuaigang project on Huai River

More Information
  • Received Date: January 28, 2004
  • Revised Date: April 19, 2004
  • A flood control operation model for Linhuaigang flood control project on Huai River is developed in this paper.The model is based on the middle breach of Huai River from Runheji to Lutaizi sections,which combines with 1-D for the branch and 2-D model for the main river and flood retention basin.The verification of the model is carried out by using flood of 1982 and 1991 data.They show that the results using this model are good agreeable with the field data However,the model can be applied to forecast the flood process and determined optimal operation modes for Linhuaigang project and flood retentions.
  • [1]
    吴时强,丁道扬.剖开算子法解具有自由表面的平面紊流速度场[J].水利水运科学研究,1992(1):39-47.
    [2]
    吴时强,吴修锋,周辉.淮河入海水道淮安地涵枢纽河道水流数值计算[J].河海大学学报,2001,29(3):27-32.
    [3]
    河海大学,等.淮河中游段淮滨-蚌埠防洪规划洪水演进数学模型[R].南京:河海大学,1994.
    [4]
    南京水利科学研究院,河南省水利厅,河南省水利勘测设计院.淮河干流淮滨至正阳关(鲁台子)河段大型防洪河工模型试验研究报告[R].南京:南京水利科学研究院,1994.
    [5]
    水利部淮委水利科学研究院,淮委规划设计研究院,安徽省水利水电勘测设计院.淮河干流淮滨至正阳关段防洪模型试验研究总报告[R].蚌埠:水利部淮委水利科学研究院,1998.

Catalog

    Article Metrics

    Article views (178) PDF downloads (640) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return