[1]
|
刘攀,郭生练,王才君,等.三峡水库动态汛限水位与蓄水时机选定的优化设计[J].水利学报,2004,36(7):86-91.(LIU Pan,GUO Sheng-lian,WANG Cai-jun,et al.Optimization of limited water level in flood season and impounding scheme for reservoir in Three Gorges Project[J].Journal of Hydraulic Engineering,2004,36(7):86-91.(in Chinese)) |
[2]
|
刘攀,郭生练,庞博,等.三峡水库运行初期蓄水调度函数的神经网络模型研究及改进[J].水力发电学报,2006,25(2):83-89.(LIU Pan,GUO Sheng-lian,PANG Bo,et al.A modified approach for deriving storage operating rules of the Three Gorges Reservoir with artificial neural network[J].Journal of Hydroelectric Engineering,2006,25(2):83-89.(in Chinese)) |
[3]
|
长江水利委员会.三峡工程综合利用与水库调度研究[M].武汉:湖北科学技术出版社,1997:169-171.(Yangtze River Water Resources Commission.Comprehensive utilization and reservoir operation of the Three Gorges Project[M].Wuhan:Hubei Technology Press,1997:169-171.(in Chinese)) |
[4]
|
彭杨,李义天,谢葆玲,等.三峡水库汛后提前蓄水方案研究[J].水力发电学报,2002,21(3):12-20.(PENG Yang,LI Yi-tian,XIE Bao-ling,et al.Study on an ahead of schedule impouding scheme of the Three Gorges Project (TGP) in the flood recession period[J].Journal of Hydroelectric Engineering,2002,21(3):12-20.(in Chinese)) |
[5]
|
彭杨,李义天,张红武.三峡水库汛末蓄水时间与目标决策研究[J].水科学进展,2003,14(6):682-689.(PENG Yang,LI Yi-tian,ZHANG Hong-wu.Study on the impounding time and objective decision of the Three Gorges Project at the end of flood period[J].Advances in Water Science,2003,14(6):682-689.(in Chinese)) |
[6]
|
李义天,甘富万,邓金运.三峡水库9月分旬控制蓄水初步研究[J].水力发电学报,2006,25(1):61-66.(LI Yi-tian,GAN Fu-wan,DENG Jin-yun.Preliminary study on impounding water of Three Gorges Project in September[J].Journal of Hydroelectric Engineering,2006,25(1):61-66.(in Chinese)) |
[7]
|
刘攀,郭生练,王才君,等.三峡水库汛期分期的变点分析方法研究[J].水文,2005,25(1):18-23.(LIU Pan,GUO Sheng-lian,WANG Cai-jun,et al.Flood Season Staged for Three Gorges Reservoir Based on the Change-Point Approach[J].Journal of China Hydrology,2005,25(1):18-23.(in Chinese)) |
[8]
|
中华人民共和国水利部.水利水电工程设计洪水计算规范(SL44-2006)[S].北京:中国水利水电出版社,2006:7-10.(The Ministry of Water Resources of the People's Republic of China.Regulation for calculating design flood of water resources and hydropower projects (No.SL44-2006)[S].Beijing:China WaterPower Press,2006:7-10.(in Chinese)) |
[9]
|
王才君,郭生练,刘攀,等.三峡水库动态汛限水位洪水调度风险指标及综合评价模型研究[J].水科学进展,2004,15(3):376-381.(WANG Cai-jun,GUO Sheng-lian,LIU Pan,et al.Risk criteria and comprehensive evaluation model for the operation of Three Gorges reservoir under dynamic flood limit water level[J].Advances in Water Science,2004,15(3):376-381.(in Chinese)) |
[10]
|
刘攀,郭生练,李玮,等.遗传算法在水库调度中的应用综述[J].水利水电科技进展,2006,26(4):78-83.(LIU Pan,GUO Sheng-lian,LI Wei,et al.A review of application of genetic algorithm to reservoir operation[J].Advances in Science and Technology of Water Resources,2006,26(4):78-83.(in Chinese)) |
[11]
|
长江三峡工程开发总公司.长江三峡水利枢纽2008年汛末试验蓄水175m方案,2008. |