南水北调中线工程对京津冀水量平衡的影响

Influence of the middle route of the South-to-North Water Diversion Project on water balance in the Beijing-Tianjin-Hebei region

  • 摘要: 南水北调中线工程通水对京津冀用水格局和水循环结构影响深远。为量化其对京津冀地区水量平衡的影响,通过构建适用于复杂渠系水网的地表-地下水耦合模拟模型MODCYCLE,并对2005—2014年(调水前)与2015—2019年(调水后)2个时段的水循环通量与水资源蓄量演变特征开展模拟分析。结果表明:中线调水有效缓解了区域水资源亏缺的状态,使京津冀地区年均水资源亏损量减少约27.0亿m3,其中浅层地下水年均少亏损18.6亿m3,修复效果显著;地表水和深层地下水亦有所改善;但全区水资源依旧处于长期亏缺状态。调水工程在当前和未来京津冀地区的水资源配置中具有关键作用,但需统筹节水、压采等综合措施,以实现地下水系统的持续修复。

     

    Abstract: The middle route of the South-to-North Water Diversion project (SNWDP-MR) significantly influences the water use patterns and hydrological cycle structure of the Beijing-Tianjin-Hebei(BTH) region. To quantify the effects of this route on the regional water balance, in this study, a coupled surface–groundwater hydrological model (MODCYCLE) suitable for complex canal network systems was developed, and simulations were conducted to analyse the temporal evolution of hydrological fluxes and water storage during two periods: 2005—2014 (prediversion) and 2015—2019 (postdiversion). The results show that the SNWDP-MR effectively alleviated the regional water deficit, reducing the average annual water loss in the BTH region by approximately 2.70 billion m3, including a reduction of 1.86 billion m3 in shallow groundwater loss, demonstrating a significant recovery of shallow groundwater. In addition, the surface water and deep groundwater conditions also improved. However, the region remains in a long-term state of water scarcity. Overall, while the project plays a key role in both current and future water resource allocation, coordinated measures such as water conservation and controlled groundwater extraction are essential to ensure the sustainable restoration of the groundwater system.

     

/

返回文章
返回