淹没丁坝群水力计算的试验研究

Experimental Study on Hydraulic Calculationfor Serial Submerged Spur Dikes

  • 摘要: 通过三姓浅滩定床物理模型试验,对淹没丁坝群的有关水力计算及对水位影响进行了试验研究,并提出了一种淹没丁坝群水面线计算的虚糙率方法.该方法简便实用,经实测资料验证,吻合较好.

     

    Abstract: Some problems relative to hydraulic calculation of serial submerged spur dikes have been studied on the fixed bed physical model of Sanxing Bank, and a calculation method of supposed roughness for water level of serial submerged spur dikes is presented in the paper, which is very simple and useful, and in good agreement with measured data.

     

/

返回文章
返回