[1] MOLLY M P.Bringing down our dams:Trends in American dam removal rationales[J].Journal of the American Water 2002,38(6):1511-1519.
[2] 刘宁.国内外大坝失事分析研究[J].武汉:湖北科学技术出版社,2002.(LIU Ning.Analysis and research of dam-failure[M].Wuhan:Hubei Science and Technology Press,2002.(in Chinese))
[3] 赵华玮,张玲,高芳.石包头水库大坝结构稳定分析[J].人民黄河,2008,30(9):83-84.(ZHAO aua-wei,ZHANG Ling,GAO Fang.Analysis on the structure stability of Shitoubao reservoir dam[J].Yellow River,2008,30(9):83-84.(in Chinese))
[4] 吴震宇,陈建康,许唯临,等.高堆石坝非线性强度指标坝坡稳定可靠度分析方法研究及工程应用[J].岩石力学与工程学报,2009,28(1):130-137.(WU Zhen-yu,CHEN Jian-kang,XU Wei-lin,et al.Research on methodology of reliability analysis of high rockfill dam slope stability using nonlinear strength indexes and its engineering application[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(1):130-137.(in Chinese))
[5] 蒙成.那读水电站大坝优化及稳定分析[J].广西水利水电,2003(4):25-28.(MENG Cheng.Scheme optimization and stability analysis of the Nadu hydropower station big dam[J].GX Water Resources & Hydropower Engineering,2003(4):25-28.(in Chinese))
[6] 柏树田,崔亦昊.堆石的力学特性[J].水力发电学报,1997,58(3):21-30.(BAI Shu-tian,CUI Yi-hao.The mechanical properties of rockfill[J].Journal of Hydroelectric Engineering,1997,58(3):21-30.(in Chinese))