[1] 朱元生 生.防洪减灾的研究动态[J].水利水电科技进展,1992,12(1):11-27.
[2] 姜万勤.并联式水库群抗洪能力图解法[J].水利管理技术,1995,(6):26-30.
[3] 姜万勤.中小型水库群防洪调度图解法[J].水利管理技术,1996,(1):53-55
[4] W W-G Yeh.Reservoir management and operations:A state-of-the-art review[J].Water Resour Res,1985,21(12):1 797-1 818.
[5] S P Simonovic.Reservoir systems analysis:closing gap between theory and practice[J].J Water Resour Plan Mgmt,1992,118(3):262-280.
[6] R A Wurbs.Reservoir-System simulation and optimization models[J].J Water Resour Res Plan Mgmt,1993,119(4):455-472.
[7] J S Windsor.Optimization model for reservoir flood contro[J].Water Resour Res,1973,9(5):1 219-1 226.
[8] J S Windsor.A programing model for the design of multi-reservoir flood control system[J].Water Resour Res,1975,11(1):30-36.
[9] 王厥谋.丹江口水库防洪优化调度模型简介[J].水利水电技术, 1985(8):17-23.
[10] 许自达.介绍一种简捷的防洪水库群洪水优化调度方法[J].人民黄河, 1990,(1):26-30.
[11] 都金康,周广安.水库群防洪调度的逐次优化方法[J].水科学进展, 1994,5(2):134-141.
[12] 都金康, 李罕,王腊春,严苏.防洪水库(群)洪水优化调度的线性规划方法[J].南京大学学报(自然科学), 1995,31(2):301-309.
[13] 王栋,曹升乐.水库群系统防洪联合调度的线性规划模型及仿射变换法[J].水利管理技术, 1998,18(3):1-5.
[14] 马勇,高似春,陈惠源.一种基于扒口分洪运用方式的防洪系统联合运行的大规模LP广义化模型及其应用[J].水利学报, 1998,(12):34-37.
[15] G A Sckultz,E J Plate.Developing operating rules for flood protection reservoirs[J]. J of Hydrol,1976,28(2/4):245-264.
[16] S A Wasimi,P K Kitanidis.Real-time forecast and daily operation of a multi-reservoirs system during floods by linear quadratic gaussion control[J].Water Resour Res,1983,19(6):1 511-1 522.
[17] 虞锦江, 等.水电站水库防洪优化控制[J].水电能源科学,1983,1(1):65-69.
[18] 管家宝, 虞锦江.梯级水电站洪水优化调度模型[J].水电能源科学, 1987,5(1):23-28.
[19] 胡振鹏,冯尚友.防洪系统联合运行的动态规划模型及其应用[J].武汉水电学院学报, 1987,(4):55-65.
[20] 胡振鹏,冯尚友.汉江中下游防洪系统实时调度的动态规划模型和前向卷动决策方法[J].水利水电技术,1988,(1):2-10.
[21] 许自达.动态规划在整体防洪优化调度中的应用[J].水力发电学报,1988,(1):12-25.
[22] 李文家,许自达.三门峡、陆浑、故县三水库联合防御黄河下游洪水最优调度模型探讨[J].人民黄河,1990,(4):21-25.
[23] 吴保生,陈惠源.多库防洪系统优化调度的一种解算方法[J].水利学报,1991,(11):35-40,46.
[24] 傅湘,纪昌明.防洪系统最优化调度模型及应用[J].水利学报, 1998,(5):49-53.
[25] J B Valdes,K M Strzepek.Aggregation-disaggregation approach to multireservoir operation[J].J Water Resour Plan Mgmt,1992,118(4):423-444.
[26] H V Vasiliadis,M Karamouz.Demand-driven operation of reservoir using uncertainty-based optimal optimal operating policies[J].J Water Resour Plan Mgmt,1994,120(1):101-114.
[27] O I Uhver,L Mays. Model for real-time optimal flood control operation of a reservoir system[J].Water Resour Mgmt,1990,4(1):20-45.
[28] S P Simonovic,D A Savic.Intelligent decision support and reservoir management and operations[J].J Comput Civ Eng,1989,3(4):367-385.
[29] 冯尚友.水资源系统工程[M]. 武汉:湖北科技出版社,1991.
[30] G L Beckor.Multiobjective analysis of multireservoir operations[J].Water Resour Res,1982,18(5).
[31] 林翔岳,许丹萍,潘敏贞.综合利用水库群多目标优化调度[J].水科学进展,1992,3(2):112-119.
[32] S Mohan,D M Raipure. Multi-objective analysis of multi-reservoir system[J].J Water Resour Plan Mgmt,1992,118(4):356-370.
[33] 陈守煜,周惠成.黄河防洪决策支持系统多目标多层次对策方案的模糊优选[J].水电能源科学, 1992,10(2):94-101.
[34] 王本德,周惠成,程春田.梯级水库群防洪系统的多目标洪水调度决策的模糊优选[J].水利学报,1994(2):31-39,45.
[35] 王本德,周惠成,蒋云钟,等.淮河流域水库群防洪调度模型与应用[J].水利管理技,1995(4):22-25.
[36] 贺北方,丁大发,马细霞.多库多目标最优控制运用的模型与方法[J].水利学报,1995(3):84-88,83.
[37] 董增川.大系统分解原理在库群优化调度中的应用[D].南京:河海大学, 1986.
[38] 封玉恒.水库群防洪优化调度模型解法及应用[J].山东水利专科学校学报,1991.3(3):26-31,36.
[39] 黄志中,周之豪.水库群防洪调度的大系统多目标决策模型研究[J].水电能源科学,1994,12(4):237-245.
[40] Ji Changming,Wang Liping,et al.Multiobjective reliability programming and decision making method in reservoir system management[J].Modell Meas Control C,1994,44(4):1-11.
[41] 王本德.水库模糊优化调度[M].大连:大连理工出版社,1990.
[42] 陈守煜.系统模糊决策理论与应用[M].大连:大连理工出版社,1994.
[43] Russell,O Samuel,et al.Reservoir operating rules with fuzzy programming[J].J Water Resour Plan Mgmt,1996,122(3):165-170.
[44] 胡铁松,万永华,冯尚友.水库调度智能决策支持系统研究[J].成都科技大学学报, 1994,(6):39-45.
[45] 陈守煜,邱林.水资源系统多目标模糊优选随机动态规划及实例[J].水利学报, 1993,(8):43-48.
[46] S A Soliman,G S Christensen.Application of functional analysis to optimization of avariable head multireservoir power system for long-term regulation[J].Water Resour Res,1986,22(6):852-858.