陈森林, 沈福新. 河道流量演算的一种新途径[J]. 水科学进展, 1994, 5(3): 200-207.
引用本文: 陈森林, 沈福新. 河道流量演算的一种新途径[J]. 水科学进展, 1994, 5(3): 200-207.
Chen Senlin, Shen Fuxin. A New Way for myer Flow Routing[J]. Advances in Water Science, 1994, 5(3): 200-207.
Citation: Chen Senlin, Shen Fuxin. A New Way for myer Flow Routing[J]. Advances in Water Science, 1994, 5(3): 200-207.

河道流量演算的一种新途径

A New Way for myer Flow Routing

  • 摘要: 系统地阐述了现行各种流量演算模型普遍存在系统偏差(注)及其造成的原因,根据河槽蓄泄特性提出了滞后出流流量演算模型及其解法.实例应用表明,该模型在实例河段优于反映非线性影响的马斯京根演算模型.

     

    Abstract: This paper expounds the systematic errors existing in operation various flow routing models and the resasons causing the errors. The Retarding Discharge Routing Model and its corresponding flow routing method are advanced on the basis of the relation between channel strorage and discharge. The fact that this model is superior to Muskingum Routing Model taking non-linear effect into account has been proved by a given example.

     

/

返回文章
返回